eTender Description
                                        
                                        
                                            Supply of Forklifts on Lease - Price Discovery
 
1) 4 Nos - 5 Ton capacity forklifts with mast height
of minimum 4.9 meters, No Driver Required, Continuous Operation,
Location: Tube Mill (Sohar)
2) 1 No - 7 Ton forklift, No Driver Required,
Continuous Operation, Location: MBM (Sohar)
3) 1 No - 5 Ton capacity forklifts with mast height
of minimum 4.9 meters, Dedicated Driver Required, Location: Muscat
(Yard)
4) 1 No - 32 Ton forklift, Driver Required,
Heavy-duty handling, Location: Tube Mill (Sohar)
 
Working Hours: 24 hours/day, as required by
operations.
Fuel: Fuel to be provided by Al Jazeera Steel
Products Co. SAOG.
 
Maintenance & Support:
- Preventive and breakdown maintenance, including regular
servicing, shall be carried out entirely by the contractor.
- One set of tyres per forklift shall be provided by the
contractor annually.
- Maintenance checklist will be provided by the Company; it
must be completed daily/weekly/monthly by the contractor.
- A full-time technician shall be stationed at Jazeera Steel
premises at no additional cost to the company.
In case the technician intends to take leave, the vendor
must provide prior intimation at least one week in advance. During such leave,
the vendor shall ensure an alternative technician is deputed, who must possess
a valid and authorized driving license approved as per company requirements.
 
Availability and Working Hours: The Equipment shall
be available for 24 Hrs a day and 720 Hrs considering 30 days, Drivers as per
above
Ageing Factor: The supplied forklift shall have a
maximum age of 3 years from the year of manufacture. Any machine older than 3
years shall not be accepted. Factors running hours of machines shall be
declared by the Vendor/bidder for equipment healthiness.     
 
PENALTY STRUCTURE FOR NON-AVAILABILITY OF FORKLIFT: 
Duration on Non-Availability            Penalty
Application
Up to 4 Hrs (Buffer Time) 
                      No Penalty
Beyond 4 Hrs upto 8 Hrs                        10
% deduction on per day hiring charges per hr
Beyond 8 Hours per Hr penalty          Penalty
of 2% of the monthly hire subjected max to 10% 
 
Spare Forklift Requirement: In the event of breakdown
of any forklift for more than 2 days, a spare forklift of equivalent capacity
must be provided immediately.
 Technical Data of Forklift:
Specification: Value/ Description
Classification: Heavy-Duty Industrial Forklift Rated
 
Capacity: 5Ton, 7Ton
and 32 Ton
Tyre Type: Solid Tires
Operating Hours: 24 Hours
Power: Diesel
Environment: Outdoor
Frame & Mast: Heavy Reinforced Steel 
 
INSURANCE:     
Full insurance coverage for all forklifts to be arranged by the
contractor. A copy of the insurance certificate must be submitted before
commencement.
CONTRACT VALIDITY:      12 months from the date of commencement.
Extension or cancellation subject to mutual agreement.
TERMINATION:
- Either party may terminate the contract with one (1) month
prior notice or intimation. 
 - Frequently unavailable/breakdown of Forklift may lead for
termination of the contract by the Company.
- In the event the Contractor enters liquidation, makes
arrangements with creditors, or fails to comply with any terms of the Contract,
AJSP reserves the right to terminate the Contract immediately, without
prejudice to any other rights or remedies. AJSP may recover from the Contractor
any losses, costs, or expenses incurred due to such default and may divert the
work to another contractor at the Contractors risk and cost if performance is
unsatisfactory or detrimental to AJSPs interests
PAYMENT TERMS: Payment will be made within 30 days of
submission of valid invoice.
INTERPRETATION OF CLAUSE:   In case of disputes, the interpretation of
any of the clauses or specifications, the decision of AJSP will be final and
binding on the Contractor 
RECOVERY:
-   In case of any
damage of equipment/machinery due to negligence of contractor or any other
reasons attributed to contractor, the decision of AJSP regarding the amount of
recovery shall be final and binding. Recovery will be effected from the monthly
bills and/or retention money if applicable.
-    If forklifts are
damaged due to improper handling by the Company, the cost of such damage shall
be borne by the AJSP.
FORCE MAJEURE:
- Force Majeure means an event or circumstance or
combination of events and circumstances beyond the reasonable control of the
Party that wholly or partly prevents or unavoidably delays an affected Party in
the performance of its obligations under this Contract, which, amongst other,
include Act of God, Natural Calamity, war, financial disorder,  economic slowdown etc.
-  The Party unable to
perform this Contract due to the effect of Force Majeure events may, after
consultation with the other Party, extend the duration of this Contract by a
period commensurate to the time actually lost due to the Force Majeure
occurrence. The other Party shall not claim compensation for the loss thus
incurred
 
NO SOLICITATION: Neither party shall directly or
indirectly solicit, hire, or engage the employees of the other party during the
term of this contract without prior written consent.
Additional Details: VAT charges 5% shall be extra
from the total price.